BATHROOM REFURBISHMENT · SOUTH YORKSHIRE
Full Bathroom Refurbishment & Shower Boarding
A complete bathroom transformation from full strip-out through to the final fixtures and finishes.

THE PROJECT
What We Did
The old bathroom suite, tiles and finishes were completely stripped out before the walls and floor were prepared. A new subfloor was fitted, followed by full-height marble-effect shower boards around the room and new herringbone-effect vinyl flooring with new skirting boards. The bathroom was completed with a new bath, toilet and pedestal basin, new taps and pipework, a chrome towel rail radiator, electrical cabling for a new extractor fan, relocation of the pull-cord light switch to an external wall switch, and preparation and painting of the ceiling.
Work carried out
- ✓ Full bathroom strip-out
- ✓ Old tile and finish removal
- ✓ Wall preparation for shower boarding
- ✓ Full-height marble-effect shower boards
- ✓ New subfloor installation
- ✓ Herringbone-effect vinyl flooring
- ✓ New skirting boards
- ✓ New bath, toilet and pedestal basin
- ✓ New taps and associated pipework
- ✓ New chrome towel rail radiator
- ✓ Electrical supply for new extractor fan
- ✓ Light switch relocated to exterior wall
- ✓ Ceiling preparation and painting
- ✓ Final sealing and finishing
BEFORE THE WORK
Before Renovation





DURING THE RENOVATION
Preparation & Work in Progress







COMPLETED PROJECT
Finished Result










Planning Something Similar?
