← Back to Our Projects
BATHROOM REFURBISHMENT · DONCASTER
Shower Boarding & Bathroom Flooring
A practical bathroom refurbishment in Doncaster with shower boarding, floor repairs and new flooring.

THE PROJECT
What We Did
The old wall tiles and damaged finishes were removed before the walls were prepared for shower panels. The basin and toilet were carefully removed and reinstated. Old vinyl and floorboards were lifted, replacement boards were fitted, and new vinyl flooring completed the bathroom.
Work carried out
- ✓ Existing wall tile removal
- ✓ Wall preparation
- ✓ Shower-board installation
- ✓ Basin and toilet removal/refitting
- ✓ Old vinyl removal
- ✓ Floorboard replacement
- ✓ New vinyl flooring
- ✓ Final sealing and finishing
BEFORE THE WORK
Before Renovation



DURING THE RENOVATION
Preparation & Work in Progress


COMPLETED PROJECT
Finished Result








Planning Something Similar?
